EasyManua.ls Logo

Toshiba PROSEC T1 - Page 79

Toshiba PROSEC T1
313 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F3B0250
Basic Hardware and Function
77
4. Installation and Wiring
In case of the expansion rack is connected to the T1/T1S, the rack mounting screw is
used for this purpose.
·
1.25 mm
2
(16 AWG) wire should be used to connect the T1/T1S and the expansion
rack/unit with the enclosure grounding bus bar.
·
100
W
or less to ground is required.
System ground
T1
Expansion rack
Mounting panel
CTi Automation - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.ctiautomation.net - Email: info@ctiautomation.net

Table of Contents

Related product manuals