EasyManua.ls Logo

tousek PULL T24 - Page 6

tousek PULL T24
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 6 - tousek / E_PULL-T24-T24speed_49002410 / 06. 08. 2019
NOTE concerning cable laying
The electric cables have to be laid in insulating sleeves which are suitable for underground usage. The insulat-
ing sleeves have to be lead into the inner of the operator housing (see picture).
230V cables and control lines have to be laid in separate sleeves.
Only double-insulated cables, which are suitable for underground usage (e.g. E-YY-J) may be used.
In case that special regulations require another type of cable, cables according to these regulations have to be used.
2.1 Installation of the motor Installation
(1) lockable emergency release (PHZ)
(2) gear wheel
(3) cable
(4) ground plate
(4a) slotted holes (4x) for connection on
the ground
(Z) steel gear rack
After installing the protection tubes (check cable exit of operator (3)) and having nished the concrete foundation, the
motor has to be bolted through the 4 slotted holes (4a) to the concrete foundation. It is particularly important that the
operator is mounted parallel to the gate panel, and that the measurements given in the drawing are kept.
63
22
121 (PULL T24speed)
113 (PULL T24)
25
2
Z
4
1
3,4
gear wheel:
PULL T24speed
: Z20M4, r44
PULL T24
:
Z16M4, r36
Foundation
43
4a
272
48,5
58,5
40
85
52
13,5
119,5
309
30,530,5
18,5 18,5
Dimensions in mm

Related product manuals