4
5. TowFLEXX Operation
5.1 Switching the Aircraft Tug on and o
5.2 Battery Disconnect Switch Activation (e-Stop)
5.3 Release Battery Disconnect Switch
5.4 Tests and Activities before daily Startup
5.5 Set Nose Wheel Adapter
5.6 Capturing the Aircraft
5.7 Aircraft Release
5.8 Turntable Motor
5.9 Nosewheel Approach Congurations
5.10 Towing Ground Support Equipment
5.11 Emergency Release of the Winch
5.12 Releasing the Magnetic Brake
6. Maintenance
6.1 Maintenance Schedule
6.2 Plan of Fuses
7. Repair and OverHaul
7.1 General Information
7.2 Requirements for the Storage Room
7.3 Actions before and during Shut Down
7.4 Required Actions during Decommissioning
7.5 Re-commissioning the Aircraft Tug
7.6 Work on the Electronics
7.7 Battery Replacement
7.8 e-Cube Replacement
7.9 Turntable Gate Realignment
7.10 Steel Cable Realignment
31
32
32
32
33
33
36
37
38
38
39
40
44
44
44
44
44
45
45
46
46
48
41
42