16
RT-SVX072A-EN
Install the factory-supplied, 3-way modulating
valve.
Complete the valve actuator wiring.
Requirements for Steam Heat (SSH_)
Install an automatic air vent at the top of the return
water coil header.
Route properly sized steam piping through the base
of the unit into the heating section.
Install the factory-supplied, 2-way modulating
valve.
Complete the valve actuator wiring.
Install 1/2", 15-degree swing check vacuum breaker
(s) at the top of each coil section. Vent breaker(s) to
the atmosphere or merge with return main at
discharge side of steam trap.
Position the steam trap discharge at least 12" below
the outlet connection on the coil.
Use float and thermostatic traps in the system, as
required by the application.
O/A Pressure Sensor and Tubing
Installation (All units with Statitrac or
Return Fans)
O/A pressure sensor mounted to the roof bracket.
Factory supplied pneumatic tubing installed
between the O/A pressure sensor and the connector
on the vertical support.
(Units with StatiTrac) Field supplied pneumatic
tubing connected to the proper fitting on the space
pressure transducer located in the filter section, and
the other end routed to a suitable sensing location
within the controlled space.
Requirements for Modulating Reheat
Install space humidity and temperature sensors.
Refer to unit diagrams for guidelines.
PPrree--IInnssttaallllaattiioonn