49
System Testing & Troubleshooting
DIAGNOSTIC DISPLAYED REASON FOR DIAGNOSTIC UCM’S REACTION RESET REQUIRED
Circuit 1 Pumpdown Terminated
by Time
Problem: Unit went through
Pumpdown on Circuit 1 and LPC
never tripped. Pumpdown was
terminated after 30 seconds.
Check: Check circuit 1 pumpdown
solenoid valve and low pressure
switch to verif
ro
er o
eration.
Unit remained in pumpdown for 30
seconds without the occurrence of
an LPC event. Pumpdown sequence
was terminated by a 30 second
timer.
No Change in unit operation
occurs. This diagnostic is for
information only.
(INFO) This diagnostic is reset when
a compressor on Circuit 1 is staged
on due to a cooling demand.
Crcuit 2 Pumpdown Terminated by
Time
(Circuit #2 40-60 Ton units only)
Problem: Unit went through
Pumpdown on Circuit 2 and LPC
never tripped. Pumpdown was
terminated after 30 seconds.
Check: Check circuit 2 pumpdown
solenoid valve and low pressure
switch to verif
ro
er o
eration.
Unit remained in pumpdown for 30
seconds without the occurrence of
an LPC event. Pumpdown sequence
was terminated by a 30 second
timer.
No Change in unit operation
occurs. This diagnostic is for
information only.
(INFO) This diagnostic is reset when
a compressor on Circuit 2 is staged
on due to a cooling demand.
Compressor Contactor Fail -
Circuit 1
Problem: The Compressor
Contactor for Circuit #1 has
malfunctioned.
The circuit #1 compressor proving
input on the SCM/MCM is detected
closed continuously for more than 3
seconds while neither compressor
output on Circuit #1 is closed.
A "Lockout Circuit #1" request is
issued to the Compressor Staging
Control function. The Compressor
Relays, LPC Bypass Relay,
Liquid Line Solenoid Relay, and
Hot Gas Bypass Relay for
Circuit 1 are all de-energized
(PMR) A manual reset is required
after the diagnostic is set. It can be
reset by the HI or Tracer, or by
cycling power to the CGM.
Compressor Contactor Fail -
Circuit 2
(Circuit #2 40-60 Ton units only)
Problem: The Compressor
Contactor for Circuit #2 has
malfunctioned.
The Circuit #2 compressor proving
input on the MCM is detected closed
continuously for more than 3
seconds while neither compressor
output on Circuit #2 is closed.
A "Lockout Circuit #2" request is
issued to the Compressor Staging
Control function. The
Compressor Relays, LPC
Bypass Relay, and Liquid Line
Solenoid Relay for Circuit 2 are
all de-energized
PMR) A manual reset is required
after the diagnostic is set. It can be
reset by the HI or Tracer, or by
cycling power to the CGM.