EasyManua.ls Logo

Trane X13511542010 - Screw Terminal Arrangement and Wiring Considerations

Trane X13511542010
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BAS-SVU10C-EN 11
Screw Terminal Arrangement
The screw terminals are arranged as follows.
Figure 5. Screw terminal diagram
Observe the following wiring considerations and requirements:
If the same power source is used for auxiliary heating stages, insta
ll jumper across RC and RH.
Maximum current is 2.0 amps.
If auxiliary output is used to toggle occupancy of the electronic control card inside the
equipment, configure the
re
lay parameter (Aux cont) to the N.O. setting. A second relay can be
added for additional functionality of the occupancy output.
Electromechanical contacts are to be used w
ith the digital inputs. Electronic triacs cannot be
used as a means of switching for the input. The switched leg to the input for the input to activate
is terminal C (common).
The transformer of the unit provides power to the therm
ostat and the
additional loads that will
be wired to the thermostat.
AU
D1
D2 RS
Scom
OS MS
Y2 Y1 G RC C
RH W1
O/B
7 Pole bottom connector
5 Pole left top connector 3 Pole left top connector

Related product manuals