8 BAS-SVU10C-EN
Installation
This section explains preliminary installation tasks, location considerations, and the installation
procedure.
Before Installation
Complete the following steps:
1. Remove the security screw on th
e bottom of Terminal Equipment Controller cover.
2. Open unit by pulling on the bottom side of Terminal Equipment Controller (see the below
figure).
3. Remove wiring terminals from sticker.
Figure 2. Opening unit
Thermostat Location
Install the thermostat
• On an inside wall only.
• Away from any direct heat source.
• Away from any air discharge grill.
• Away from direct sun radiation.
Nothing should restrict vertical air circulation to the Terminal Equipment Controller.
Installation Procedure
1. Swing open the Terminal Equipment Controller PCB to the left by pressing the PCB locking tabs
(Figure 3, p. 9).
2. Pull out cables 6 inch out from
the wall.
3. Wall surface must
be flat and clean.
4. Insert cable in the cen
tral ho
le of the base.