EasyManua.ls Logo

Trane X13511542010 - Page 9

Trane X13511542010
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BAS-SVU10C-EN 9
Installation
5. Align the base and mark the location of the two mounting holes on the wall. Install proper side
of base up.
6. Install anchors in the wall.
7. Insert screws in mounting holes on each side of the base (see the figure below).
Figu
re 3. Location of PCB retaining tabs
8. Gently swing back the circuit board on the base and push on it until the tabs lock it.
9. Strip each wire 1/4 inch from end.
10. Insert each wire according to wiring diagram.
11. Gently push excess wiri
ng b
ack into hole (see the figure below).
12. Re-install wiring terminals in their correct locations (see the fi
gure below).
13. Re-install the cover (top side first) and gently push extra wire length back into the hole in the
wall.
14.
Install security screw.
Figure 4. Reinstall terminal blocks

Related product manuals