EasyManua.ls Logo

Troxler PaveTracker Plus 2701-B - MIX Calibration

Troxler PaveTracker Plus 2701-B
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3–6
Mix Calibration
As noted earlier, the PaveTracker Plus can be calibrated for a
specific mix using the Mix Calibration function. To use this
function, the operator takes gauge measurements at three to
ten locations across the material. The gauge compares these
values to values obtained by core analysis or another method
to determine a slope and intercept for that particular material.
The gauge can store up to four mix calibrations.
NOTE
In order for the gauge to calculate both a slope and an
intercept for the test material, measurements must be
performed at a minimum of three locations. Also, the
difference between the minimum and maximum reading
must be at least 3 pcf. For best results, Troxler
recommends taking measurements at seven to ten
locations.
To access the Mix Calibration function, press 8 on the Setup
menu shown on page 27. The gauge displays:
Selections 1 through 4 show the mix calibrations that have
been stored previously. Use the numeric keys to enable an
existing mix calibration, create a new calibration, disable an
active calibration, or view a calibration.
2.
4.
6. Di sabl e
1.
3.
5.
New
7. Vi ew

Related product manuals