37
OPERATING THE DIRECTIONAL SPEED CONTROLS
PRELIMINARY STEPS TO MOVING THE
MACHINE IN ANY DIRECTION WITH
ENGINE RUNNING
1. Raise the Power Rake to the transport position
using the procedure described in the “CON-
TROLS” Section.
49
2. Place LEVER, A, in the TRANSMISSION
ENGAGED position as shown.
A
50
3. Start the engine using the procedure described
in the “ENGINE OPERATION” Section.
51