EN – 41
Preparation / Basics
3.1 Set-up and assembly
3.1.1 Assembly
The OMEGO
®
Basic is shipped pre-assembled. However, certain installation works can
only be carried out once the device has been set up at its final destination. The system
will be unpacked and installed by specially trained TYROMOTION GmbH staff. The
following steps have to be executed prior to the OMEGO
®
Basic’s initial operation:
Fixation of monitor/handle bracket
Fix the monitor/handle bracket in place by moving the bracket towards the catch bolt,
then push the rail into the tilting joint until the catch bolt latches. Secure the bracket
with the adequate screw to make sure it cannot tilt forwards during adjustments.