EasyManuals Logo

Vaillant ECOTEC PLUS VU 80 User Manual

Vaillant ECOTEC PLUS VU 80
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Installation
ecoTEC plus installation and maintenance instructions 0020134823_01 13
4
Transporting the box from the delivery point to the
installation site – first or higher floor, cellar
It is recommended that two people lift the unit together.
> Use safe lifting techniques – keep your back straight –
and bend your legs at the knee.
> Hold the load as close as possible to your body.
> If the unit is being lifted by 2 persons, ensure your move-
ments are coordinated during lifting.
> Avoid bending your upper body - do not lean forwards or
to the side.
> Clear your path before lifting the unit.
> Use safe lifting techniques – keep your back straight –
and bend your legs at the knee.
> Do not twist your body – instead, reposition your feet.
> Avoid tripping hazards, slippery or wet surfaces as well
as steps and stairs.
> If required, get somebody to assist you in this.
Transporting the box from the delivery point to the
installation site – roof
> The unit must be lifted by two persons.
> Coordinate your movements.
> Avoid bending your upper body - do not lean forwards or
to the side.
> Clear your path before lifting the unit.
> Avoid tripping hazards, slippery or wet surfaces as well
as steps and stairs.
> If the unit is being transported to an attic storey, one
person must guide the unit from above, while the other
supports the unit from below.
> Use safe lifting techniques – keep your back straight –
and bend your legs at the knee.
> Hold the load as close as possible to your body.
> If required, get somebody to assist you in this.
> The attic storey must be safely accessible and must have
a solid floor and suitable lighting.
> If the attic storey is accessed via a hatch, the hatch must
be secured against falling using a suitable guard rail.
> Before setting up the unit, it is recommended that you
perform a risk assessment of the attic storey, to clarify
access, floor rigidity, lighting and other factors, and any
measures to be undertaken in advance.
Unpacking the unit from the box
> It is recommended that two persons lift the unit out of
the box.
> Always keep the working area free from obstacles.
> Cut through the two straps.
> Open the box flaps.
> Remove the polystyrene parts from the box
> Separate the box in the centre at the pull-out strap.
> Lift the upper part of the box away.
> Lift the unit out of the box.
> Use safe lifting techniques – keep your back straight –
and bend your legs at the knee.
> Hold the load as close as possible to your body.
> If required, get somebody to assist you in this.
> Dispose of the packaging responsibly.
> Wear appropriate cut-resistant and non-slip gloves to
protect yourself against sharp edges and maintain a safe
and secure grip while handling the unpackaged unit.
Positioning the unit for final installation – no
obstacles
> If the unit weighs more than 25 kg, it should always be
transported by two persons, where possible.
> Fix the unit bracket securely to the wall before lifting the
unit and placing it in position.
> Ensure that you hold on to the front and side of the unit
securely, lift it, hold it in a balanced position and then lift
it further upwards and position it on the bracket.
> Use safe lifting techniques – keep your back straight –
and bend your legs at the knee –if you are lifting some-
thing from the floor.
> Do not twist your body – instead, reposition your feet.
> During the entire lifting process, hold the boiler as close
as possible to your body to minimise the strain on your
back.
> Ensure your movements are coordinated so that the
weight of the unit is evenly distributed.
> If required, get somebody to assist you in this.
> Wear appropriate cut-resistant and non-slip gloves to
protect yourself against sharp edges and maintain a safe
and secure grip while handling the unit.
Positioning the unit for final installation – above a
work surface, possible obstacles, etc.
If the unit weighs more than 25 kg, it should always be
transported by two persons, where possible.
> Fix the unit bracket securely to the wall before lifting the
unit and placing it in position.
> If required, provide the work surface with sufficient pro-
tection against damage.
> Ensure that you hold the unit securely at the front and
side and lift it - if available - onto the work surface.
> Hold the unit in a balanced position and then lift it fur-
ther upwards and position it on the bracket.
> If the unit is being positioned on the bracket by two per-
sons, ensure that you have a firm grip on the front and
side/bottom of the boiler.
> Ensure your movements are coordinated if the unit is
being lifted by 2 persons, so that its weight is evenly dis-
tributed.
Use safe lifting techniques – keep your back straight – and
bend your legs at the knee –if you are lifting something
from the floor.
> Do not twist your body – instead, reposition your feet.
> During the entire lifting process, hold the boiler as close
as possible to your body to minimise the strain on your
back.
> Avoid bending your upper body - do not lean forwards or
to the side.
> If required, get somebody to assist you in this.
> Wear appropriate cut-resistant and non-slip gloves to
protect yourself against sharp edges and maintain a safe
and secure grip while handling the unit.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vaillant ECOTEC PLUS VU 80 and is the answer not in the manual?

Vaillant ECOTEC PLUS VU 80 Specifications

General IconGeneral
BrandVaillant
ModelECOTEC PLUS VU 80
CategoryBoiler
LanguageEnglish

Related product manuals