EasyManua.ls Logo

Varian archon - Page 55

Default Icon
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-12
Sequence Step Purpose
9. Syringe -> waste The syringe transfers the water to the waste bottle.
10. Rinse sparge tube The sparge tube is rinsed if rinses have been
programmed.
11. Heating water Water is heated.
12. Water -> lines Hot water fills the lines.
13. Water -> syringe Hot water fills the syringe.
14. Syringe -> sparge tube The syringe transfers the water to the sparge tube.
15. Sparge tube -> syringe The syringe withdraws the water from the sparge
tube.
16. Syringe -> waste The syringe transfers the water to the waste bottle.
17. Sparge tube ->syringe If any sample remains in sparge tube, it is drawn into
syringe.
18. Syringe -> waste The syringe transfers sample to the waste bottle.
19. Helium ->waste Helium is again flushed through the sample path to
the waste bottle.
20. Flush syringe If flushes have been programmed.
21. Heating water Water is heated.
22. Water -> lines Hot water now fills the lines.
23. Water -> syringe Hot water now fills the syringe.
24. Syringe -> waste The syringe now transfers the water to the waste
bottle.
25. Helium -> waste Helium is again flushed through the sample path to
the waste bottle.
26. Flush complete Syringe flushing is completed.
27. End water blank This completes the blank sample process sequence.

Table of Contents

Related product manuals