Commissioning Guide VESDA-E VEA
32407_01 1
1 Introduction to VESDA-E VEA Commissioning
Commissioning is the final stage of the system installation. It forges together the elements of designing and
installing the tubes, installing the detector(s), cabling for power and communications, and the powering up of
the detector. The objective and outcome of the commissioning process is to provide a fully functional VESDA-
E VEA detector that matches local code requirements and customer specification.