EasyManua.ls Logo

Vibra AJ-CESeries - Basic Operations; Installation Guide

Vibra AJ-CESeries
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
3. Basic Operations
3.1 Installation
1 Positioning the measurement pan
First, mount the pan base on the
main unit of the balance and place
the measurement pan on top of it.
2 Securing the exact level of the balance
Turn the adjusters until the bubble
rests in the center of the red circle
on the level.
<Caution>
Use caution when operating the
adjusters on the square-pan type to
prevent them from lifting up.
3 Connecting the AC adapter
Connect the AC adapter to the
balance, as illustrated at left.
Take 5 minutes before operation.
<Caution>
If the balance has the battery
installed, refer to “11. Operating the
Balance with the Battery,” on page
39.
Position of air bubble
in the level

Related product manuals