EasyManua.ls Logo

Vicon EXTRA 632 FR - Page 90

Vicon EXTRA 632 FR
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
90
Maintenance
Internal inspection
Every season
»Maintenance intervals« page 73
An internal inspection of the cones is carried out in the following way:
> Open the first guard.
> Use a suitable tool and remove the guard around the cutterbar's
transmission.
> Remove the cone's top cover.
> Clean the inside of the cone.
> Fit the cone's top cover.
Guard
Top cover

Related product manuals