Commissioning steps
Inspection steps
Maintenance steps Page
1. Removing the front panels................................................................................................ 30
2. Moving the programming unit to the maintenance position.......................................... 30
3. Commissioning the system............................................................................................... 30
4. Filling the heating system................................................................................................. 34
5. Venting the boiler............................................................................................................... 36
6. Venting the heating system............................................................................................... 36
7. Filling the DHW cylinder on the DHW side...................................................................... 37
8. Checking the connections on the heating water and DHW sides................................. 37
9. Naming the heating circuits.............................................................................................. 37
10. Entering contact details of heating contractor................................................................ 37
11. Checking the gas type....................................................................................................... 38
12. Converting the gas type (only for operation with LPG).................................................. 38
13. Checking the static pressure and supply pressure........................................................ 39
14. Function sequence and possible faults........................................................................... 40
15. Setting the max. heating output........................................................................................ 41
16. Activating screed drying................................................................................................... 41
17. Adjusting pump rate of integral circulation pump.......................................................... 42
18. Checking the balanced flue system for leaks (annular gap check)............................... 43
19. Removing the burner......................................................................................................... 44
20. Checking the burner gasket and burner gauze assembly.............................................. 45
21. Checking and adjusting the ignition and ionisation electrodes.................................... 46
22. Checking the back draught safety devices...................................................................... 46
23. Cleaning the heating surfaces.......................................................................................... 47
24. Checking the condensate drain and cleaning the trap................................................... 47
25. Installing the burner........................................................................................................... 49
26. Checking the neutralising system (if installed)
27. Checking anode connection and anode earth current with anode tester..................... 50
28. Draining the boiler on the DHW side................................................................................ 50
29. Cleaning the loading cylinder........................................................................................... 51
30. Checking and replacing the protective magnesium anode (if necessary)................... 52
31. Re-assembling and filling the loading cylinder............................................................... 53
32. Checking the diaphragm expansion vessel and system pressure................................ 54
33. Checking pre-charge pressure and DHW expansion vessel (if installed).................... 55
34. Checking the safety valve function
35. Checking the electrical connections for firm seating
36. Checking gas equipment for leaks at operating pressure............................................. 55
37. Checking the combustion quality..................................................................................... 55
38. Checking the flue system for unrestricted flow and leaks
39. Checking the external LPG safety valve (if installed)
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6151778

Table of Contents