EasyManua.ls Logo

VIPA SSM-BG41 - 5.1 Startup procedure

VIPA SSM-BG41
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual BG41/BG42/BG43 Startup
Rev. 99/49 5-1
5 Startup
5.1 Startup procedure
= Connect the corresponding module to the building block.
= If a 24V supply is necessary on the modules, equip them with the respective jumpers
(see chapter 5.2.9).
= Address the building block with the respective DIL switches (see chapter 5.2.7).
= Switch off the current supply at the PLC and plug the building block according to the instructions
into your PLC (see chapter 5.2).
= Connect the building block’s 25-pole SubD socket with the corresponding peripheral.
= Switch the voltage supply at the PLC on again.
= Observe the reaction of the possibly available LEDs on the building block. See chapter 3.1.2.

Table of Contents

Related product manuals