EasyManua.ls Logo

Vogt P18FXT - Page 122

Default Icon
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10TA Service Manual
INDEX
5/30/14
12-2
H (Cont.)
High Head Pressure (Air-Cooled) ------------------------------- 8-10
High Head Pressure (Water Cooled) ---------------------------- 8-9
High/Low Pressure Switch ----------------------------------------- 9-4
History, Tube-Ice® --------------------------------------------------- 1-1
HMI, Interface -------------------------------------------------------- 10-5
Hub, Cutter Drive Gear -------------------------------------------- 9-21
I
Ice Bin Thermostat Location-------------------------------------- 3-13
Ice Capacity ---------------------------------------------------------- 11-3
Important Safety Notice --------------------------------------------- 1-2
Inspection, First Arrival --------------------------------------------- 2-1
Installation -------------------------------------------------------------- 3-1
Installation Review: A Checklist -------------------------------- 3-14
Introduction ------------------------------------------------------------ 1-1
J, K
L
Low Compressor Oil Level ----------------------------------------- 8-8
Low Ice Capacity ----------------------------------------------------- 8-7
Low Pressure Switch ------------------------------------------------ 9-4
Lubrication ------------------------------------------------------------ 7-6
Lubrication, Compressor ------------------------------------------- 7-6
Lubrication, Cutter Gear Reducer -------------------------------- 7-7
M
Machine Ratings (50 Hz., 24 HP) ------------------------------- 11-2
Machine Ratings (60 Hz., 21 HP) ------------------------------- 11-1
Machine Room -------------------------------------------------------- 2-1
Machine Won’t Run -------------------------------------------- 8-2, 8-3
Maintenance ----------------------------------------------------------- 7-1
Maintenance Program ---------------------------------------------- 7-1
Make-Up Water ------------------------------------------------------- 3-1
Manual Harvest Push Button -------------------------------- 5-2, 6-1
Metric Conversion --------------------------------------------------- 11-7
Mechanical Cleaning ------------------------------------------ 7-5, 7-6
N
NEMA ------------------------------------------------------------------- 2-1
Nomenclature, Piping ---------------------------------------------- 4-2
Non-Condensable Gases ----------------------------------------- 9-14
Normal Operating Vitals ------------------------------------------- 11-4
O
Oil Pressure Safety Control---------------------------------------- 9-9
Operating Tips -------------------------------------------------------- 5-3
Operation Vitals ------------------------------------------------------ 11-4
Optional Equipment, Power Monitor --------------------------- 10-2
Overload Protection, Cutter Motor Starter --- 6-2, 6-4, 6-5, 6-6
Overload Protection, Pump Motor Starter --- 6-2, 6-4, 6-5, 6-6
P
Pin, for Cutter Bearing --------------------------------------------- 9-20
Piping and Drain Connections ------------------------------------ 3-1
Piping Schematic, Air-cooled-------------------------------------- 4-4
Piping Schematic, Nomenclature -------------------------------- 4-2
Piping Schematic, Water cooled --------------------------------- 4-3
PLC (Programmable Logic Controller) ----------------- 10-4, 10-6
Poor Ice Quality ------------------------------------------------------- 8-6
Power Connection ---------------------------------------------------- 3-5
Power Monitor ------------------------------------------------------ 10-1
Preventive Maintenance -------------------------------------------- 7-8
Preventive Maintenance Program ------------------------------- 7-8
Preview ----------------------------------------------------------------- 1-1
Principle of Operation ----------------------------------------------- 4-1
Pump Down ---------------------------------------------------------- 9-12
Pump Overload Protection ----------------------- 6-2, 6-4, 6-5, 6-6
Pump, Contactor ------------------------------------ 6-2, 6-4, 6-5, 6-6
Q
R
R-22 (HCFC-22) ------------------------------------------ 1-2, 2-1, 5-1
R404A ------------------------------------------------------------------ 5-1
Receipt of Machine -------------------------------------------------- 2-1
Receiver ---------------------------------------------------------------- 4-1
Refrigerant Charge --------------------------------------------------- 5-1
Refrigerant Leaks -------------------------------------------- 5-1, 9-14
Refrigerant, Removal ---------------------------------------------- 9-13
Refrigeration System Review ------------------------------------- 5-1
Rotation Check -------------------------------------------------------- 3-6
S
Safety Notice ---------------------------------------------------------- 1-2
Safety Symbols and What They Mean-------------------------- 1-3
Safety Valves ---------------------------------------------------------- 2-1
Sanitizing Procedure ------------------------------------------------ 7-2
Shipping Papers ------------------------------------------------------ 2-1
Solenoid Valve ------------------------------------------------------ 9-15
Space Diagram (Air-Cooled Machine) -------------------------- 3-3
Space Diagram (Water Cooled Machine) ---------------------- 3-4
Special Precautions -------------------------------------------------- 1-2
Start Push Button (PB1) -------------------- 5-2, 5-3, 6-3, 6-4, 6-5
Start-Up ----------------------------------------------------------------- 5-2
Start-Up Checklist -------------------------------------------------- 3-15
Storage (prior to installation and start-up) --------------------- 2-2
Suction Cut-Off Unloader----------------------------------------- 9-16
Symptoms, Troubleshooting --------------------------------------- 8-2
T
Telephone Number, Vogt------------------------------------------- 1-1
Temperature-Pressure Chart ------------------------------------ 11-6
Thawing, Chamber --------------------------------------------------- 4-1
Thawing, Timer (T) ------------------------- 6-2, 6-4, 6-5, 6-6, 9-12
Thermostat, Bin Installation -------------------------------------- 3-13
Thermostat, Setup ------------------------------------------------- 3-14
Timer, Thawing------------------------------ 6-2, 6-4, 6-5, 6-6, 9-12
Trap (AC Piping) ---------------------------------------------------- 3-11
Troubleshooting ------------------------------------------------------- 8-1
U
Unloader - Loaded Operation (Freeze Period) ------------- 9-16
Unloader - Unloaded Operation (Harvest Period) --------- 9-16

Table of Contents

Related product manuals