EasyManua.ls Logo

Wacker Neuson BH - Storage; Temporary Decommissioning; Final Shutdown

Wacker Neuson BH
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Storage
12.1 Temporary decommissioning
42
Operator’s Manual | BH | 5100056183 | 10/2022 | [en-US]
12 Storage
12.1 Temporary decommissioning
Information
Further information and detailed descriptions, see Maintenance on
page 35.
Storage requirements
Store dust-free and dry.
Do not store outdoors.
Protect from direct sunlight.
Observe storage temperature, see Technical Data on page 45.
Store in a locked place that is not accessible to children.
If the machine is stationary for more than 1 month, perform the following
measures:
Fuel tank Drain fuel completely.
Engine Check and clean air filter.
Clean fuel filter.
Components subject to corrosion Oil and grease.
If the machine is shut down for more than 6 months, contact a service
partner.
12.2 Final shutdown
If the machine is no longer in use and is shut down for good, all operating
fluids must be drained.
Have the machine professionally dismantled and disposed of by a state-
approved recycling company.
Professional disposal of this machine avoids negative effects on human
health and the environment, helps with the targeted treatment of pollu-
tants and makes it possible to recycle valuable raw materials.

Related product manuals