Commissioning
8.2 Tests before commissioning
28
Operator’s Manual | BH | 5100056183 | 10/2022 | [en-US]
NOTICE
Information on operation!
Make use of the machine's own weight when working.
Do not press violently against the material. This does not increase
the performance of the machine.
Press the machine so strongly against the material to be processed
that the machine deflects noticeably.
As soon as the lower stop is felt, press less strongly.
Information
Change of tools!
No additional tools are required to change the tool.
8.2 Tests before commissioning
Information
Further information and detailed descriptions, see Maintenance on
page 35.
Perform the following checks:
Check machine and components for damage.
Do not put the damaged machine into operation. Damages and
defects must be repaired immediately.
Check the fuel level.
Check fuel lines for leaks.
Check air filter.
Check reversing starter.
8.3 Putting into operation for the first time
8.3.1 Making the machine functional
1/2
Plug the spark plug connector 1 onto the spark plug 2.