EasyManua.ls Logo

Wacker Neuson DPU 100-70Les

Wacker Neuson DPU 100-70Les
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Transport DPU 100-70Les
26 Operator's manual
5.2 Transporting the machine
Note:
The central suspension is located exactly in the center of gravity of the machine.
For uses where the overall height is crucial, you can move the central suspen-
sion to the back (torque = 85 Nm). The device is then no longer balanced and
will topple forward when it is lifted up.
1. Place the machine upright on a flat surface.
2. Switch off the engine.
3. Vertically set guide handle head and lock into place.
4. Use suitable lifting tackle at the central suspension.
5. Lift the machine evenly with the hoist.
6. Carefully set the machine down on a suitable transport vehicle.
7. Fasten machine with all tie-down lugs.

Table of Contents

Related product manuals