EasyManuals Logo

Wacker Neuson E 2200 User Manual

Wacker Neuson E 2200
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #56 background imageLoading...
Page #56 background image
Operation E 2200 / E 3000ES
56 wc_tx001667gb.fm
Continued from the previous page.
4. Place the open end of the fill hose into a container of HTF.
5. Move and hold the bypass switch (x) in the ON position. HTF will begin to flow.
When the HTF level is between the minimum and maximum marks on the
sightglass:
a.Pull the fill hose from the HTF supply.
b.Release the bypass switch.
NOTICE: Do not overfill the HTF reservoir.
Prepare
machine for
operation
After filling the HTF reservoir, perform the procedure below to prepare the machine
for operation.
1. Press and release the “RESET” button (d) on the low-level shut-down device.
The following will occur:
The “POWER” (green) (f) and “LOW WATER” (red) (e) lights will blink for
fifteen seconds while the low-level shut-down device performs a self-
diagnostic test.
After 15 seconds, the “LOW WATER” light will go out—the “POWER” light will
stay on.
The low HTF level indicator will go out.
Power will be returned to the pump circuit.
Power will be returned to the burner circuit.
This procedure continues on the next page.
wc_
r008068
x

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E 2200 and is the answer not in the manual?

Wacker Neuson E 2200 Specifications

General IconGeneral
BrandWacker Neuson
ModelE 2200
CategoryHeater
LanguageEnglish

Related product manuals