E 2200 / E 3000ES Operation
wc_tx001667gb.fm 57
Continued from the previous page.
2. Move the fill valve (3) to the CLOSED position and insert the pin.
3. Move the operation valve (2) to the OPEN position.
4. Clean the fill hose, and cap the fill hose if a cap is provided.
5. Return the fill hose to its storage location under the hose reel.
Result
The machine is now ready for operation.
wc_gr007810
2
3
2
3