Operation
Towing
BA RD24_RD28 en us 06
93
Putting parking brake out of
operation
15496
A
The pretension of the spring-operated brakes may only be reduced when
towing with a defective diesel engine or hydraulic system.
1. Loosen screw [A] and screw out by hand until a resistance can be
noted (approximately 5 rotations).
2. Release the spring-operated brakes by turning the steering wheel to
the left until increased turning power is required.
3. During towing, the spring-operated brakes must be kept open by
repeated releasing with the steering wheel due to interior leaks.
Putting parking brake in
operation
1. Screw in screw [A] up to the valve seat (max. 30 Nm).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RD 24 and is the answer not in the manual?

Wacker Neuson RD 24 Specifications

General IconGeneral
BrandWacker Neuson
ModelRD 24
CategoryConstruction Equipment
LanguageEnglish

Related product manuals