EasyManua.ls Logo

Wacker Neuson RD 24

Wacker Neuson RD 24
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Drive unit - diesel engine
108
BA RD24_RD28 en us 06
NOTE
Purging of the fuel system is performed by starting the
diesel engine. For this, several starting attempts may be
necessary. The starting process may last 20 seconds as a
maximum; otherwise, the starter winding will be overheated
and destroyed. There must be pauses of a minimum of 1
minute between the individual starting processes in order to
allow the starter to cool down.
The fuel prefilter must be drained at the drain valve [A] from time to time
depending on the water content in the fuel.
4.02.05 Checking and cleaning dust discharge valve
15479
A
Prior to start of work check whether the opening of the dust discharge
valve [A] is clogged with moist dirt deposits.
1. Switch off diesel engine and remove ignition key.
2. Squeeze the dust discharge valve [A] and clean the discharge slot.

Table of Contents

Related product manuals