7.3 TASKS
4
2
1
B_06877
5
6
8
3
open
closed
Ensure that:
commissioning was carried out in accordance with Chapter 6.7.
1. Visual check:
personal safety equipment, grounding and all devices ready to use.
2. Close the valve (3).
3. Slowly open the ball valve (2).
4. Observe superordinate operating manual. Open the valve (4).
5. Activate the pressure regulator (1) and set the required operating pressure.
6. Open and close the valve (4) and/or the the lock units on the product line in order
to start and/or interrupt the product ow.
7. Start work process.