4
VERSION 01/2018
ORDER NUMBER DOC 2316596
6 ASSEMBLY AND COMMISSIONING 25
6.1 Training of Assembly/Commissioning Personnel 25
6.2 Storage Conditions 25
6.3 Installation Conditions 25
6.4 Transportation 25
6.5 Assembly and Installation 26
6.5.1 Ventilation of the Spray Booth 27
6.5.2 Air Supply Lines 27
6.5.3 Product supply lines 27
6.6 Grounding 27
6.7 Commissioning 29
7 OPERATION 30
7.1 Training the Operating Personnel 30
7.2 Emergency Stop 30
7.3 Tasks 31
7.4 Pressure Relief/Work Interruption 32
7.5 Basic Flushing 33
7.6 Filling with Working Material 33
8 CLEANING AND MAINTENANCE 34
8.1 Cleaning 34
8.1.1 Cleaning Personnel 34
8.1.2 Decommissioning and Cleaning 34
8.1.3 Long-term Storage 34
8.2 Maintenance 35
8.2.1 Maintenance Personnel 35
8.2.2 Maintenance Instructions 35
8.2.3 Safety Checks and Maintenance Intervals 36
8.2.4 Emptying Pump 38
8.2.5 Filling the Empty Pump 39
9 TROUBLESHOOTING AND RECTIFICATION 40
10 REPAIRS 41
10.1 Repair Personnel 41
10.2 Repair Notes 41
10.3 Tools 41
10.4 Cleaning the Parts After Disassembly 42
10.5 Assembly of the Device 42