Operating manual Piston Pump EvoMotion 5-125
6 Assembly and Commissioning
30 Order number 2316596 | Edition 03/2021
Info
Safe operation of the pump is only guaranteed with a grounding connection. Connect all
grounding cables using a short and direct route.
1 Grounding cable
1. Screw on grounding cable with eyelet.
2. Clamp the grounding cable clip to a grounding connection on site.
3. Ground the product tank to an on-site grounding connection.
4. Ground the other parts of the system to an on-site grounding connection (16 mm2;
AWG 6).
Ex zone
All devices and equipment must be suitable for use in potentially explosive areas.
– All paints, flushing agents and waste tanks have to be electrically conductive.
– All tanks must be grounded.