21
Installation
5325
1
5326
2
Installation
Transportation and unpacking,
EX618, EX625
The machine is delivered complete with expan-
der bolts etc. packed inside the machine in the
drum.
The machine is delivered bolted onto the trans-
port pallet and packed in a crate or box.
• Removepackingfromthemachine.
• Removefrontandrearpanel.Removethe
bolts between the machine and pallet.
• Mountfrontandrearpanel.
• Mountthefeet.
• Placethemachineonitsnalposition.
• Levelthemachinewiththefeetofthe
machine.
The machine also comes with transport safety
devices (four plate angles between the frame
and the drum).
In order to remove the safety devices:
• Unpackthemachine.
• Removefrontandrearpanel.
• Removebothfrontmetalangels.
• Removebothrearmetalangels.
NOTE!
Once the shipping safety devices have been
removed, handle the machine carefully to
avoid damage to the suspension components.
1
2