EasyManua.ls Logo

Waters APGC - Preparing the Source Ion Block for LC Operation

Default Icon
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-22 Setting up the APGC
location. For all other instruments, retain the sample cone for use in the
next procedure.
Store all other APGC components in a safe location.
Preparing the source ion block for LC operation
Required materials
Chemical-resistant, powder-free gloves
Combined, 2.5-mm Allen wrench and cone extraction tool
Requirement: During LC operation with the Xevo TQD or SQ Detector 2
instrument, you must use the original, 0.50-mm, sample cone supplied with
the instrument, to avoid problems associated with low sensitivity.
To prepare the source ion block for LC operation:
1. Use the 2.5-mm, combined Allen wrench and cone extraction tool to fit
and tighten the screw and washers securing the upper, gas-cone position
block to the ion block assembly (see page 2-8).
2. Repeat step 1 for the lower, gas-cone position block.
Warning: To avoid personal contamination with biologically
hazardous, toxic, or corrosive materials, and to avoid
spreading contamination to uncontaminated surfaces, wear
clean, chemical-resistant, powder-free gloves when handling
source components.
Warning: To avoid burn injuries, take great care while
working with the source components, which can be hot.
Caution: To avoid damaging the instrument by sudden
venting, do not open the source isolation valve before the
sampling cone assembly is securely fitted to the ion block
assembly.

Table of Contents

Related product manuals