13
Initial Operation
13.1
Initial Operation Information
WARNING
Never operate the heater in closed rooms such as garages or workshops that do not have an ex-
haust extraction unit.
In workshops with exhaust extraction units, make sure that the exhaust extractor is fully opera-
tional.
Carefully read the heater operating manual, follow the procedures and safety information found therein.
13.2
Initial Start-Up Checklist
(Yes/No/Comments)
Is the heater assembly safely secured and rigid?
(Ensure all bracket fasteners are right)
Is there a safe clearance from heat-generating components? (Ex-
haust, etc.)
Is there sufficient clearance between the heater and any vehicle
moving components under all operating conditions? (Steering at full
lock, torqued driveline, loaded or unloaded suspension, etc.)
Is the heater mounted in an acceptable position according to the
limitations noted in this installation manual?
Is the heater installed in a location that is protected from road-
debris and splash water, or items stored in the same compartment?
Is there sufficient clearance between the heater and the ground?
(Yes/No/Comments)
Is there adequate clearance (min. 4 in.) from heat-generating com-
ponents? (Exhaust, heater body, ducts, etc.)
Is there adequate clearance from sharp edges/objects? (Ensure ad-
equate cut protection has been installed)
Are there any kinks, sharp bends, or the possibility of pinched hoses
or harnesses, cuts and/or rub-through?
Have all the hose clamps been properly positioned and tightened?
Has the coolant system been topped off and bled per the vehicle
manufacturer’s specifications for proper mixture and type?
Has a pressure test been performed on the coolant system under all
operating conditions?