iil,l.I _
i_iiiiii
ii i
48. Wrap the Low Cable (86) around a 3 1/2"
Pulley (82). Attach the Pulley and a Cable
Trap (80) to theAb Upright (1) with the 3/8" x
3 3/4" Bolt (76) and a 3/8" Nylon Locknut (42).
Be sure that the Cable Trap is in the indi-
cated position.
49.
Remove the indicated 3/8" x 2" Bolt (50), the
3/8" Nylon Locknut (42), the 3 1/2" Pulley
(82), and the Cable Trap (80) from the indicat-
ed Pulley Plates (31). Wrap the Low Cable
(86) over the Pulley. Reattach the Pulley and
the Cable Trap to the lowest hole in the
Pulley Plates with the Bolt and the Locknut.
Make sure that the Cable Trap is turned to
hold the Cable in place.
50.
Wrap the Low Cable (86) around a 3 1/2"
Pulley (82). Attach the Pulley to the Ab
Upright (1) with the 3/8" x 3 3/4" Bolt (76), a
3/8" Washer (38), and a 3/8" Nylon Locknut
(42). The ball on the Cable must be on the
indicated side of the Pulley. Make sure that
the Cable and Pulley move smoothly and
that the Cable is between the Pulley and
the post.
48
49
5O
42
%.
82
76
19