EasyManua.ls Logo

Wing Inflatables P4.7 - Field Repair;Solvent Bonding Technique

Default Icon
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40| P a g e
Field Repair/Solvent Bonding Technique
(If repairs are needed without access to heat gun.)
1. Follow steps 1-9 of “Fabric Preparationto prepare the surface to receive the patch, then complete the
additional steps in this section.
2. Line up the patch to the taped off area on the craft receiving the patch. Make sure the patch corners are
rounded.
3. When second coat is dry on both patch and tube (at least 20 minutes) reactivate the adhesive by lightly wiping
both surfaces with solvent and immediately apply patch to surface.
4. Starting at one edge apply pressure to ensure contact between the surfaces. Avoid air bubbles. Apply extra
pressure when bonding over seams. Glued patch and boat will be “tacky” so take this bonding slowly to prevent
a second attempt.
5. Wait 5-10 minutes and check patch edges. Wait additional time if necessary. If edges have not adhered, flash
with solvent and press down again.
6. If possible, wait at least 24 hours before inflation of MBT (a minimum of 12 hours is required).

Related product manuals