11 / 47
11 Safety goggles Operators wear
12
Anti-dust respirator Operators wear
3.5. Installation Position
WKS I inverter should be vertically mounted (to ensure fast heat dissipation), please choose a position without
direct sunlight / snow accumulation to install WKS I inverter. Please the installation position is well-ventilated.
OK
NO
Fig. 4 Installation Position of WKS I inverter