EasyManua.ls Logo

Wolf FGB-35 - Filling the Heating System

Wolf FGB-35
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
3064458_201811
Fig: Automatic air vent valve on the heating circuit pump
Automatic
air vent valve
Filling the heating system
To ensure correct function of the condensing boiler, ll
the system as instructed, vent it completely and ll the
trap.
We recommend using a sludge separator with integral
magnetite separator in the boiler inlet to protect the
high efciency pump and the boiler. This is particularly
relevant for old systems and mixed installations.
Before connecting it, ush the entire system
to remove residues such as weld beads,
hemp, putty, etc. from the pipework. Check
the dirt lter.
The gas condensing boiler must be switched OFF.
Close the gas ball valve.
Open the cap of the automatic air vent valve on the
high efciency pump by one revolution.
Open all radiator valves.
Open the ow and return valves on the boiler.
Slowly ll the entire heating system and gas
condensing boiler while cold up to approx. 2 bar via
the return line (external pressure gauge required).
Inhibitors and antifreeze are not permitted.
Bleed all radiators and if the system pressure drops
signicantly, top up with water to reach 2 bar again.
Check the entire system and all component unions
for water leaks.
If leak tightness cannot be ensured, there is a
risk of water damage.
Switch on the power supply to the gas condensing
boiler AP indication on the display for the duration of
the venting program.
Briey open the manual air vent valve on the ow
pipe until all air has escaped and then close it again.
Collect any water expelled.
Please note
Please note
18. Filling the heating system / trap
Fig: Manual air vent valve
Slightly open the
manual air vent valve

Related product manuals