Commissioning steps Testvaluesorconrmation
1.) Serial number on the type plate
_______________________________________
2.) Electrical wiring / connection / fuse protection checked in
accordance with technical data of installation instructions and
VDE regulations?
□
2.) System ushed? □
3.) System lled and water treatment carried out?
- pH value set
- total hardness set
□
________________ pH value
____________________ °dH
4.) Appliance and system vented? □
5.) System pressure 2.0 - 2.5 bar? □
6.) Water connections checked for leaks? □
7.) Trap lled? □
8.) Gas restrictor inserted according to gas type? Natural gas □
LPG □
Wobbe index _____________ kWh/m³
Net caloric value, heating ______ kWh/m³
9.) Gas supply pressure checked? □
10.) Gas tightness test carried out? □
11.) Switch boiler ON, set control unit to OFF / Standby. □
12.) Standard setting of control unit set? □