80
3064458_201811
Ensure that the ues can be inspected regarding their free cross-section. For this,
provide an appropriate inspection aperture in the installation room, in consultation with
your local ue gas inspector.
Connections on the ue gas side are made using female connections with gaskets.
Always position female connections against the direction of the condensate ow. Install
thebalanceduewithaslopeofatleast3°towardsthegascondensingboiler.
Use spacer brackets to secure the sections in place (see installation examples).
Connectiontobalancedue
The calculated length of the balanced ue or standard ue is comprised of the straight
pipe length and the length of the pipe bends.
Example for a 60/100 system
1)
:
Straight balanced ue pipe. length 1.5 m L = straight length + bend length
1 x 87° bend
≙
1.5 m L = 1.5 m + 1 x 1.5 m + 2 x 1.3 m
2 x 45° bends
≙
2 x 1.3 m L = 5.6 m
Calculatingthebalanceduelength
Note: To avoid reciprocal interference between balanced ues routed above the
roof, we recommend maintaining a minimum clearance of 2.5 m between
balanced ues.
1)
Length equivalence of the system:
60/100 80/125
87° bend 1.5 m 3 m
45° bend 1.3 m 1.5 m
Minimum shaft size for room sealed operation C93x
31.Technicalinformation,balancedue
Assumption: the installation room contains
2x inspection bends, 1x 87° bend and 1.5 m
horizontal with 87° support bend
5
7
9
11
13
15
17
90 95 100 105 110 115 120 125 130 135 140
max. Schachtlänge in [m]
Schachtquerschnitt in [mm]
FGB-28 am Schachtquerschnitt eckig bei C93x in DN 80
Anschluss DN 80/125
Anschluss DN 60/100
5
7
9
11
13
15
17
100 110 120 130 140 150 160
max. Schachtlänge in [m]
Schachtquerschnitt in [mm]
FGB-28 am Schachtquerschnitt rund bei C93x in DN 80
Anschluss DN 80/125
Anschluss DN 60/100
Max. shaft length in [m]
Shaft cross-section in [mm]
Max. shaft length in [m]
Shaft cross-section in [mm]
4
6
8
10
12
14
16
18
20
22
24
90 100 110 120 130 140 150
max. Schachtlänge in [m]
Schachtquerschnitt in [mm]
FGB-35 am Schachtquerschnitt eckig bei C93x in DN 80
Anschluss DN 80/125
Anschluss DN 60/100
4
6
8
10
12
14
16
18
20
22
105 11 0 115 120 125 130 135 140 145 15 0
max. Schachtlänge in [m]
Schachtquerschnitt in [mm]
FGB-35 am Schachtquerschnitt rund bei C93x in DN 80
Anschluss DN 80/125
Anschluss DN 60/100
Shaft cross-section in [mm] Shaft cross-section in [mm]
Max. shaft length in [m]
Max. shaft length in [m]
FGB-28
FGB-35
Connection DN 80/125
Connection DN 60/100
Connection DN 80/125
Connection DN 80/125
Connection DN 80/125
Connection DN 60/100
Connection DN 60/100
Connection DN 60/100