Setup
Prepare mast
3
3-10 WM doc 12/21/22Setup
Prepare mast
1. Insert the mast cross member into the upright pieces, as shown in FIG. 3-10.
2. Set the bolts in place as shown in FIG. 3-10.
NOTE: Do not tighten at this time.
Install the sawhead
1. Lay the sawhead flat on a surface high enough to
allow the carriages to extend downward (approxi-
mately 1ft (25cm)).
2. Slip the mast through the sawhead guides
.
NOTE: Ensure that the
scale guide is on the
same side as the
up/down crank bracket.
3. Slide the mast uprights all the way into the car-
riages
.
NOTE: Make sure that it
slides all the way to the
bottom of the carriage
and then tighten the M10-1.5x70 carriage bolts. See FIG. 3-11.
4. Install the two head-locking stop pins, locking the sawhead in the down position.
FIG. 3-10
Rod, Lift Cable
Nut, M8-1.25
Nylock
Bolt, M8x8 SH
Shoulder Plain
Nut, M8-1.25 Free
Hexagon, Lift Cable
Nut, M10-1.50
Bolt, M10-1.5x75
Engine Muffler Notch
Washer, M8 Flat
Upright Cross Channel
Carriage Post,
Right Side
Carriage Post,
Left Side
FIG. 3-11
Sawhead Guides
Scale Guides
Crank Bracket