COMMISSIONING REPORT
6 720 641 467 (2010/01)
52
16 COMMISSIONING REPORT
Customer/system user:
System installer:
Type of heat pump: Heat pump serial number:
Commissioning date: HWDU serial number:
Other system components:
Outdoor sensor T2 Room temperature sensor T5
Hot water cylinder temperature sensor T3
Others:
Points to be checked prior to commissioning
Heating system: Filled Checked
Electric heater set to 4.5 kW: Set Checked
Filters: Checked Cleaned
Sight glass: Checked Comments:
Heating system pump G1A/G1B working correctly: Heat carrier pump G2 working correctly:
Operating temperature after 10 minutes in heating/DHW mode:
Heat flow out T8:.................. °C Heat return in T9:.................. °C
Sensor condensor temp T10:................... °C Refrigerant temp T11:.................. °C
Defrost sensor T12:................... °C
System pressure levels checked ...............................................................................................................................
Functional test carried out ........................................................................................................................................
Ensure that primary circuit has been correctly flushed .............................................................................................
Check fan operation on outdoor unit ........................................................................................................................
Check for insulation of pipe work .............................................................................................................................
Check that CANbus is fitted correctly .......................................................................................................................
Check term switches positioned correctly ................................................................................................................
Check condensation drain operates .........................................................................................................................
Hot water peak set ....................................................................................................................................................
Electricity reading on the house taken ......................................................................................................................
The instructions about how to use the heat pump have been given to the client / to the user
...................................................................................................................................................................................
Documentation about the heat pump has been handed over:......................................................................................
Date and signature of system installer:
Tab. 14