COMMISSIONING
INSTALLATION & SERVICING INSTRUCTIONS
32
8 716 115 216b (09.2008)
FINISHING COMMISSIONING
FINISHING COMMISSIONING
1 Engage top panel (D) onto rear retainers
(E) and lower front of panel into position.
Secure with screws (C).
2
Swing control panel assembly (A) into
the boiler.
Secure with screw (B).
3
Locate bottom corners of the front panel
(F) into retainers (G).
Push top of front panel to engage clips
(H).
HANDOVER:
Complete the Benchmark log book at the
rear of the manual.
Set up the controls and show the user how
to operate all the controls shown in the
User Guide.
If the appliance is unused and exposed to
freezing conditions, advise the customer
of the precautions necessary to prevent
damage to the boiler, system and building.
In the event of the appliance being
inoperative, isolate the boiler and drain
the system and boiler.