EasyManua.ls Logo

Xylem WTW OxiTop-IDS - The Course of the Measurement

Xylem WTW OxiTop-IDS
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Multi 3630/3620 IDS Operation with OxiTop
®
-IDS measuring heads
ba77045e01 09/2019 21
5.1.2 The course of the measurement
Preparation before
starting the
measurement
1 Carry out the preparatory activities
(see section 5.1.1 P
REPARING THE MEASUREMENT):
Keep ready the instruments and accessories required
Determining the sample volume
Preparing the samples
2 Switch on the meter with <On/Off>.
3 If necessary, use <M_> to switch to operation with the OxiTop
®
-IDS
measuring heads.
The OxiTop set management (overview of the sets started) is dis-
played.
During the initial commissioning the list OxiTop set management is
empty.
The display shows No data available!.
4 In the OxiTop set management, use <F1>/[New] to create a new set of
samples.
The Set menu opens.
5 Adjust the temperature of the solutions and measure the current tem-
perature if the measurement is made without a temperature sensor.
190216-1 5/5 BOD5 21.05.2019
190216-2 360/360 BOD5 21.05.2019
190216-3 6/7 BOD7 23.05.2019
190217-1 4/4 BOD4h 17.05.2019
190220-1 4/20 BOD20 12.06.2019
190220-2 360/360 BOD5 21.05.2019
RED_F113-1 1/5 p5 25.05.2019
190223-1 137/360 BOD30m 23.05.2019
79 Free measuring heads
OxiTop set management
28.05.2019 08:00
DeleteNew

Related product manuals