EasyManuals Logo

Yale Veracitor GCC060VX User Manual

Yale Veracitor GCC060VX
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background imageLoading...
Page #125 background image
Table 6. (See Figure 17 Through Figure 20) (Continued)
Item No. Item
8 Hr/
1 Day
250 Hr/
6 Mo
500 Hr/
6 Mo
1000 Hr/
6 Mo
2000 Hr/
1 Yr
4000 Hr/
2 Yr
Procedure
or Quantity
Specification
12 DRIVE BELT
Kubota 2.5L Engine
X Check for
Wear and
Damage.
Adjust as
Needed.
12 DRIVE BELT
Yanmar 2.6L and 3.3L
Engines
X Check for
Wear and
Damage.
Adjust as
Needed.
12 DRIVE BELT
Kubota 2.4L Diesel
Engines
X Check for
Wear and
Damage.
Adjust as
Needed.
13 TIMING BELT
PSI 2.4L Engine
C Replace as
Necessary.
20 PCV VALVE
PSI 2.4L
X C Replace as
Necessary.
See NOTE 12
and NOTE
15.
See Parts Manual.
X = Check C = Change L = Lubricate CIL = Check indicator light during operation
Maintenance Schedule
123

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Yale Veracitor GCC060VX and is the answer not in the manual?

Yale Veracitor GCC060VX Specifications

General IconGeneral
BrandYale
ModelVeracitor GCC060VX
CategoryLifting Systems
LanguageEnglish

Related product manuals