5. ADJUSTMENTS UPON INSTALLATION (Cent’d)
Upon installation ,
make adjustments in reference to the
adjustment procedures given. in the table below.
Table 5.1
Adjustment Procedures
No. Procedure
Remarks
1
Check the interior and exterior of the control cabinet.
2
Check screw terminals for tightness.
3 Connect external cables and check.
t
4
Connect the power input cable.
s
Check connector and module locations to be sure of
positive connections.
6
Check settings.
7
I
Check input power supply voltage and frequency.
I
~
Check that the composite power supply unit outputs are
not short-circuited.
9
Check the output voltages after initially applying power.
,0
Check the 1/0 signals between the NC unit and the
machine tool.
11
Check parameters and setting data.
12
Perform a second power application.
13
Check to be sure the emergency stop functions.
14
Check movement on each axis by manual feed.
m
1
15
I
Adjust the servo system.
I
16 Check that all NC functions operate successfully.