EasyManua.ls Logo

YASKAWA YASNAC i80 - Page 179

YASKAWA YASNAC i80
226 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(d)
Insert the CN34 and CN35 cables into the original
positions.
(3) Checking Functions After Replacement
(a) Check that +5V,
t
12V, and
+24V
outputs are not
shorted due to overloading.
(b) Apply the first power and second power again and
check that no alarm occurs.
(c) Check that the spindle can be controlled manually.
169

Table of Contents