EasyManua.ls Logo

YSI 2700 SELECT - Page 39

YSI 2700 SELECT
165 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-26
Once the installed membranes and probes are equilibrated, the probe baseline current typically
runs below 2 nA. This equilibration may take a day or two and does not usually affect operation
during the first day since autocalibrations compensate for probe current drift.
When enzyme membrane replacements are required in the future, stabilization will occur much
more rapidly, usually within several minutes of installation, if there has been no power
disruption to the instrument.

Table of Contents

Related product manuals