chapter3. Equipment Installation and
Commissioning
3.1 Equipment Installation
3.1.1.1 Unpacking Steps
Before installation, disassemble the wooden for the machine in the following steps:
Fig. 3-1 Equipment Packing Case
Base packing case
Control cabinet packing
case
Workbench packing case
Prize up the packing case of the machine with a crowbar. Unpack in the following order:
top cover, left and right side covers, front and rear side covers, fastening ropes or fixing
plate.