EasyManuals Logo

AAON RN Series Installation, Operation & Maintanance Manual

AAON RN Series
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
44
Figure 21 - 90-140 ton Condenser Coil Guard Installation Instructions 2
Outside Air Rain Hood
Rain hood must be opened before startup of
the unit. Fresh air intake adjustments should
be made according to building ventilation of
local code requirements.
6-25 and 30 ton Units
Remove the two screws at the bottom of the
rain hood that secure it in the shipping
position. Remove the screws that attach the
side pieces of the hood to the top of the
hood.
Rotate the side pieces so that the holes along
one edge line up with the holes on the top
piece and the flange is on the inside of the
rain hood.
Attach the side pieces to the top of the hood
using the provided screws and attached the

Table of Contents

Other manuals for AAON RN Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AAON RN Series and is the answer not in the manual?

AAON RN Series Specifications

General IconGeneral
CategoryHeat Pump
HSPFUp to 10.0
RefrigerantR-410A
Compressor TypeScroll
EfficiencyHigh
SeriesRN
Voltage Options208-230/460V
Unit WeightVaries with model
DimensionsVaries with model

Related product manuals