EasyManua.ls Logo

ABB GOE 2600 - Page 17

ABB GOE 2600
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
17
9. Lower the bushing onto the support blocks.
G006952
10.
Remove the soft lifting sling at the top part of the porcelain insulator.
End of instruction

Table of Contents

Related product manuals