EasyManua.ls Logo

ABB XFC G5 - Pipe Mount Installation

ABB XFC G5
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 | XSERIES G5 START UP GUIDE | 2106001MNAA
Pipe mount installation
IMPORTANT NOTE:
Select a mounting location that allows for
easy access, is close to the tap valves, and complies with all
local and national codes.
Materials:
One (1) enclosure mounting kit (includes instructions, brackets, U-bolts
and fastening hardware)
One (1) pipe saddle with mounting hardware (size determined by
technician)
One (1) 2 inch x 40 inch pipe (length may be extended if mounting a
solar panel). See Figure 3-1: Solar panel
.
Pipe-mount the XFC (XRC is similar):
1. Position the pipe saddle on the meter run and temporarily attach the
saddle to the meter run pipe using the associated hardware.
Figure 2-1: Mounting pipe
Legend: Mounting pipe
1
Meter run
3
Saddle
2
2 inch x 40 inch Mounting pipe
4
U Mounting bolt
2. Screw the mounting pipe into the saddle until it is tight.
2
1
4
3

Table of Contents

Other manuals for ABB XFC G5

Related product manuals